The proposed project will reduce the isolation of communities, including refugees, and Host Communities, through climate-resilient connectivity improvements. It will equally support the livelihoods of communities through the construction of socio-economic infrastructure and the provision of temporary employment opportunities for refugees, women and men in the project area. These interventions are expected to restore and enhance resilience in the Far-North...

* Le résumé de projet étant tiré du document d'évaluation de projet (PAD), du rapport d'évaluation (SAR) ou du document du programme (PGD), il peut ne pas refléter exactement la teneur du projet en son état actuel.

Voir plus

Objectif de développement

The proposed Project Development Objective (PDO) is to: (i) enhance connectivity and climate resilience along the MDK road section; and (ii) improve access to basic socioeconomic infrastructure in selected districts of the Far North of Cameroon.

Clé Détails

Projet Détails

  • P178207

  • Active

  • Papa Ndiaye , Theophile Bougna Lonla

  • Ministry of Public Works

  • Cameroun

  • 14 juin 2022

  • (à la date de présentation au Conseil)

    20 juin 2023

  • 16 mai 2024

  • USD 280.00 millions

  • Ministry of Economy, Planning, and Regional Development

  • Western and Central Africa

  • 2023

  • USD 330.00 millions

  • N/A

  • 12 janvier 2024

  • 30 juin 2029

  • Yes

  • BANK APPROVED

  • Notes

Finances

Plan De Financement (Millions De Dollars)

Pas de données disponibles.
Org. De Financement Engagements
IDA Credit 168.34
IDA Grant 50.00
IDA Shorter Maturity Loan (SML) 111.66

Financement total du projet (USD millions)

Type de produit/service BIRD/IDA
Engagement BIRD N/D
Engagement IDA 330.00
Engagement BIRD + IDA 330.00
Instrument de prêt
Élément don N/D
Coût total du projet** 280.00

État récapitulatif du financement de la Banque (USD millions) au 28 février 2025

Télécharger:
Pas de données disponibles.
Org. De Financement Date D'approbation Date De Cloture Montant En Principal Décaissé Remboursements Intérêts, Charges Et Commissions Financières

Activité financière détaillée au 28 février 2025

Télécharger:
Pas de données disponibles.
Période Org. De Financement Type De Transaction Montant (USD)

Footnotes

Ratings

EXÉCUTION DU PROJET

Name Review Date
Procurement Moderately Satisfactory 2024-10-12
Financial Management Moderately Satisfactory 2024-10-12
Progress towards achievement of PDO Satisfactory 2024-10-12
Project Management Satisfactory 2024-10-12
Monitoring and Evaluation Satisfactory 2024-10-12
Overall Implementation Progress (IP) Moderately Satisfactory 2024-10-12

FIN D’EXÉCUTION DU PROJET

Pas de données disponibles.

NOTATION DE L’ÉVALUATION INDÉPENDANTE

Pas de données disponibles.

Cadre de résultats

INDICATEURS DES OBJECTIFS DE DÉVELOPPEMENT DU PROJET

INDICATEURNIVEAU DE RÉFÉRENCE EN COURS OBJECTIF
  • The share of people with access to an all-weather passable road within five kilometers of the MDK road section (modified road access index).Valeur80.0080.0091.00
    Date30 juin 202314 septembre 202329 juin 2029
    Observation
  • Number of health centers along the Mora–Dabanga–Kousséri road section with improved road accessValeur0.000.0020.00
    Date30 juin 202314 septembre 202329 juin 2029
    Observation
  • Number of health centers around around refugee camps with improved road accessValeur0.000.003.00
    Date30 juin 202314 septembre 202329 juin 2029
    Observation
  • Number of refugees and host communities population with access to an all-weather passable road within five kilometers of the MDK road section.Valeur0.000.00123000.00
    Date3 juillet 202314 septembre 202329 juin 2029
    Observation
  • Number of markets along the Mora–Dabanga–Kousséri road section with improved road accessValeur0.000.006.00
    Date30 juin 202314 septembre 202329 juin 2029
    Observation
  • Share of women with improved access to an all-weather passable road within five kilometers of the MDK road section.Valeur0.000.0030.00
    Date
    Observation
  • Share of beneficiaries reporting satisfaction with the socio-economic infrastructuresValeur0.000.0085.00
    Date30 juin 202314 septembre 202329 juin 2029
    Observation
  • Number of markets around refugee camps with improved access to marketsValeur0.000.003.00
    Date30 juin 202314 septembre 202329 juin 2029
    Observation
  • Average travel time between Mora and KoussériValeur8.008.003.00
    Date30 juin 202314 septembre 202329 juin 2029
    Observation
  • Number of schools along the Mora–Dabanga–Kousséri road section with improved road accessValeur0.000.0041.00
    Date30 juin 202314 septembre 202329 juin 2029
    Observation
  • Length of MDK road vulnerable to identified climate change hazards (floods and heat).Valeur205.00205.000.00
    Date17 avril 202314 septembre 202329 décembre 2028
    Observation
  • Number of schools around refugee camps with improved road accessValeur0.000.0010.00
    Date30 juin 202314 septembre 202329 juin 2029
    Observation

INDICATEURS DE RÉSULTATS INTERMÉDIAIRES

INDICATEURNIVEAU DE RÉFÉRENCE EN COURS OBJECTIF
  • Institutional capacity of the decentralized PIUs of MINTP and MINEPAT (PSRDREN) improvedValeurNoNoYes
    Date30 juin 202314 septembre 202329 juin 2029
    Observation
  • Number of water points constructed or rehabilitated with improved conditionsValeur0.000.0030.00
    Date30 juin 202314 septembre 202329 juin 2029
    Observation
  • Number of schools constructed or rehabilitated along the MDK roadValeur0.000.0020.00
    Date30 juin 202314 septembre 202329 juin 2029
    Observation
  • Road safety audits conductedValeurNoNoYes
    Date30 juin 202314 septembre 202329 juin 2029
    Observation
  • Length of road rehabilitated with safety and climate change resilient features along the MDK road sectionValeur0.000.00212.00
    Date30 juin 202314 septembre 202329 juin 2029
    Observation
  • Number of health centers constructed or rehabilitated along the MDK roadValeur0.000.0012.00
    Date30 juin 202314 septembre 202329 juin 2029
    Observation
  • Proportion of complaints addressed timelyValeur0.000.00100.00
    Date30 juin 202314 septembre 202329 juin 2029
    Observation
  • Length of bridge rehabilitatedValeur0.000.00180.00
    Date30 juin 202314 septembre 202329 juin 2029
    Observation
  • Number of cattle markets constructed or rehabilitated along the MDK and roads connecting refugees camps and host communitiesValeur0.000.005.00
    Date30 juin 202314 septembre 202329 juin 2029
    Observation
  • Number of students enrolled in the internship Program within the project and MINTPValeur0.000.0045.00
    Date30 juin 202314 septembre 202329 juin 2029
    Observation
  • Road safety measures introduced along the Mora-Dabanga-KousseriValeurNoNoYes
    Date30 juin 202314 septembre 202329 juin 2029
    Observation
  • Construction or rehabilitation of community multimedia centersValeur0.000.003.00
    Date30 juin 202314 septembre 202329 juin 2029
    Observation
  • Climate change resilient features introduced along the Mora-Dabanga-KousseriValeurNoNoYes
    Date30 juin 202314 septembre 202329 juin 2029
    Observation
  • Number of women’s groups supported through trainings and equipment provisionValeur0.000.005.00
    Date30 juin 202314 septembre 202329 juin 2029
    Observation
  • Length of road connecting refugees camps and host communities rehabilitated with safety and climate change resilient featuresValeur0.000.00150.00
    Date3 juillet 202314 septembre 202329 juin 2029
    Observation
  • Percentage of women from the internship Program who report being employed 12 months after they completed the internshipValeur0.000.000.00
    Date
    Observation
  • Storage facilities rehabilitated/constructed reserved/leased for womenValeur0.000.0050.00
    Date30 juin 202314 septembre 202329 juin 2029
    Observation
  • Kilometer of communal and regional roads maintained and rehabilitated with safety and climate change resilient features along the MDKValeur0.000.0050.00
    Date30 juin 202314 septembre 202329 juin 2029
    Observation
  • Share of women enrolled in the internship Program within the project and MINTPValeur0.000.0040.00