Sri Lanka Public Financial Management Strengthening Project

Résumé*

The project is aligned with and supports selected governance reforms as prioritized by the GoSL. The project will support: (i) the improvement of procurement outcomes through enhancement of the existing e-procurement system, including open contracting standards and the roll-out of new modules covering national and international bidding and functionalities in key service delivery ministries to enhance transparency and accountability; and (ii) enhance...

* Le résumé de projet étant tiré du document d'évaluation de projet (PAD), du rapport d'évaluation (SAR) ou du document du programme (PGD), il peut ne pas refléter exactement la teneur du projet en son état actuel.

Voir plus

Objectif de développement

To enhance the institutional capacity and transparency in procurement and external audit.

Clé Détails

Projet Détails

  • P178432

  • Active

  • Mohan Gopalakrishnan , Heenaben Doshi

  • Democratic Socialist Republic of Sri Lanka

  • Sri Lanka

  • 8 février 2023

  • (à la date de présentation au Conseil)

    27 juin 2023

  • 6 juillet 2023

  • USD 7.10 millions

  • NATIONAL AUDIT OFFCIE OF SRI LANKA,Ministry of Finance, Economic Stabilization and National Policies - Public Finance Department,National Audit Office of Sri Lanka

  • Asie du Sud

  • 2023

  • USD 4.20 millions

  • N/A

  • 9 octobre 2023

  • 30 novembre 2026

  • Yes

  • BANK APPROVED

  • Notes

Finances

Plan De Financement (Millions De Dollars)

Pas de données disponibles.
Org. De Financement Engagements
Miscellaneous 1 4.20

Financement total du projet (USD millions)

Type de produit/service BIRD/IDA
Engagement BIRD N/D
Engagement IDA N/D
Engagement BIRD + IDA N/D
Instrument de prêt
Élément don 4.20
Coût total du projet** 7.10

État récapitulatif du financement de la Banque (USD millions) au 31 mars 2025

Télécharger:
Pas de données disponibles.
Org. De Financement Date D'approbation Date De Cloture Montant En Principal Décaissé Remboursements Intérêts, Charges Et Commissions Financières

Activité financière détaillée au 31 mars 2025

Télécharger:
Pas de données disponibles.
Période Org. De Financement Type De Transaction Montant (USD)

Footnotes

Ratings

EXÉCUTION DU PROJET

Name Review Date
Procurement Moderately Satisfactory 2024-11-08
Progress towards achievement of PDO Moderately Satisfactory 2024-11-08
Overall Implementation Progress (IP) Moderately Unsatisfactory 2024-11-08
Project Management Moderately Satisfactory 2024-11-08
Financial Management Satisfactory 2024-11-08
Monitoring and Evaluation Satisfactory 2024-11-08

FIN D’EXÉCUTION DU PROJET

Pas de données disponibles.

NOTATION DE L’ÉVALUATION INDÉPENDANTE

Pas de données disponibles.

Cadre de résultats

INDICATEURS DES OBJECTIFS DE DÉVELOPPEMENT DU PROJET

INDICATEURNIVEAU DE RÉFÉRENCE EN COURS OBJECTIF
  • Specialized audits carried out by NAOSL that are made publicly availableValeurA limited number of specialized audits carried outYet to be initiatedAudit reports of specialized audits available in p
    Date31 décembre 20226 octobre 202330 novembre 2026
    Observation
  • Information available in the public domain on procurement opportunitiesValeurInformation on shopping procurement using e-procurInformation on shopping procurement using e-procurEnhanced access to information on procurement oppo
    Date31 décembre 20226 octobre 202330 novembre 2026
    Observation
  • Reduction in procurement cycle time in at least two procurement entities with significant procurement volumesValeurLack of information on procurement cycle time in pBaseline survey to be initiated in two MDAs10 percent reduction in time taken for procurement
    Date31 décembre 20226 octobre 202330 novembre 2026
    Observation
  • NAOSL’s capacity developed to undertake participatory auditsValeurLimited engagement of citizens in the audit procesEngagement with potential peer SAIs initiatedNAOSL’s institutional capacity for participatory a
    Date31 décembre 20226 octobre 202330 novembre 2026
    Observation

INDICATEURS DE RÉSULTATS INTERMÉDIAIRES

INDICATEURNIVEAU DE RÉFÉRENCE EN COURS OBJECTIF
  • E-procurement system established and operationalValeurThere is an e-procurement system that provides theA draft implementation plan has been prepared. TheAn E-procurement system covering various methods o
    Date30 novembre 20226 octobre 202330 novembre 2026
    Observation
  • Improvement in performance rating of NAOSL in selected priority indicators as per SAI-PMF AssessmentValeurNAOSL performing between the founding and establisNAOSL is in the process of engaging a consultant tIncrease in NAOSL’s SAI-PMF Assessment rating in p
    Date29 novembre 20196 octobre 202330 novembre 2026
    Observation
  • Scale up of existing modules and roll out of new modules of the e-GP systemValeurShopping module rolled out in 40 pilot procuring eOf the 301 procuring entities (PE) registered at tE-Procurement system rolled out to all procuring e
    Date30 décembre 20226 octobre 202330 novembre 2026
    Observation
  • Capacity Building of NAOSL staff in specialized Audits (No. of staff trained)ValeurLimited and absence of structured training in specUpdate of manuals yet to be initiatedThe capacity of NAOSL staff enhanced to carry out
    Date30 décembre 20226 octobre 202330 novembre 2026
    Observation
  • Of which No. of staff trained are femaleValeurNilNil40 female staff have received specialized training
    Date30 décembre 202228 septembre 202330 novembre 2026
    Observation
  • Information on contract award in public domainValeurContract award information not available in publicMoF has mandated the e-publication of contract awa60 percent of shopping procurement and 50 percent
    Date31 décembre 20226 octobre 202330 novembre 2026
    Observation
  • Enhanced access and use of audit management software (AMS) and Computer Assisted Audit Techniques (CAAT)ValeurOutdated AMS and no CAAT tools in useConsultant to study the existing AMS and appropriaEnhanced efficiency in audits by NAOSL through use
    Date31 décembre 20226 octobre 202330 novembre 2026
    Observation