Vanuatu Affordable and Resilient Settlements Project

Résumé*

Component 1: Affordable and Resilient New Settlement Development This component will develop a new urban expansion area on 10 ha of public land in Etas, able to accommodate 171 households. The site is in a low-hazard area and connected to existing trunk infrastructure. The objective is to develop a replicable model for future urban expansion that is planned; has basic public infrastructure (roads, drainage, streetlights, sanitation) and amenities...

* Le résumé de projet étant tiré du document d'évaluation de projet (PAD), du rapport d'évaluation (SAR) ou du document du programme (PGD), il peut ne pas refléter exactement la teneur du projet en son état actuel.

Voir plus

Objectif de développement

The PDO is to: (i) improve access to and resilience of infrastructure and services in selected new and existing settlements, and (ii) strengthen land planning and management for resilient human settlement.

Clé Détails

Projet Détails

  • P173278

  • Active

  • Andre Bald , Tevi Obed

  • Ministry of Finance and Economic Management

  • Vanuatu

  • 1 juin 2021

  • (à la date de présentation au Conseil)

    17 mars 2022

  • 5 août 2022

  • USD 25.00 millions

  • Ministry of Lands and Natural Resources

  • Asie de l’Est et Pacifique

  • 2022

  • USD 25.00 millions

  • N/A

  • 20 février 2024

  • 30 juin 2027

  • TBD

  • BANK APPROVED

  • Notes

Finances

Plan De Financement (Millions De Dollars)

Pas de données disponibles.
Org. De Financement Engagements
IDA Grant 25.00

Financement total du projet (USD millions)

Type de produit/service BIRD/IDA
Engagement BIRD N/D
Engagement IDA 25.00
Engagement BIRD + IDA 25.00
Instrument de prêt
Élément don N/D
Coût total du projet** 25.00

État récapitulatif du financement de la Banque (USD millions) au 31 mars 2025

Télécharger:
Pas de données disponibles.
Org. De Financement Date D'approbation Date De Cloture Montant En Principal Décaissé Remboursements Intérêts, Charges Et Commissions Financières

Activité financière détaillée au 31 mars 2025

Télécharger:
Pas de données disponibles.
Période Org. De Financement Type De Transaction Montant (USD)

Footnotes

Ratings

EXÉCUTION DU PROJET

Name Review Date
Project Management Satisfactory 2024-06-28
Financial Management Satisfactory 2024-06-28
Monitoring and Evaluation Satisfactory 2024-06-28
Overall Implementation Progress (IP) Moderately Satisfactory 2024-06-28
Procurement Moderately Satisfactory 2024-06-28
Progress towards achievement of PDO Moderately Satisfactory 2024-06-28

FIN D’EXÉCUTION DU PROJET

Pas de données disponibles.

NOTATION DE L’ÉVALUATION INDÉPENDANTE

Pas de données disponibles.

Cadre de résultats

INDICATEURS DES OBJECTIFS DE DÉVELOPPEMENT DU PROJET

INDICATEURNIVEAU DE RÉFÉRENCE EN COURS OBJECTIF
  • People in existing settlements provided with improved urban living conditions (disaggregated by gender)Valeur0.000.00100.00
    Date20 septembre 20218 décembre 202330 juin 2027
    Observation
  • Number of people with leases signed for the new residential development, disaggregated by gender and incomeValeur0.000.00130.00
    Date10 novembre 20218 décembre 202330 juin 2027
    Observation
  • New subdivision lots approved according to disaster- and climate-risk informed urban and land management procedures as per the National Subdivision PolicyValeur0.000.0090.00
    Date20 septembre 20218 décembre 202330 juin 2027
    Observation

INDICATEURS DE RÉSULTATS INTERMÉDIAIRES

INDICATEURNIVEAU DE RÉFÉRENCE EN COURS OBJECTIF
  • Infrastructure designs incorporating relevant climate and disaster resilience measuresValeur0.000.00100.00
    Date20 septembre 20218 décembre 202330 juin 2027
    Observation
  • Beneficiaries that feel that project investments reflected their needs (gender-disaggregated)Valeur0.000.0070.00
    Date10 novembre 20218 décembre 202330 juin 2027
    Observation
  • Time taken for subdivision approval of already-zoned, registered land reducedValeur54.000.0018.00
    Date10 novembre 20218 décembre 202330 juillet 2027
    Observation
  • Site development (with resilient basic infrastructure and services) completed for new residential developmentValeur0.000.0010.00
    Date10 novembre 20218 décembre 202330 juin 2027
    Observation
  • Roads constructed or rehabilitatedValeur0.000.006.80
    Date10 novembre 20218 décembre 202330 juin 2027
    Observation
  • Integrated land, cadastral, and hazard mapping system for Greater Port Vila established, maintained, and publicly availableValeurNoNoYes
    Date10 novembre 20218 décembre 202330 juin 2027
    Observation
  • People provided with access to improved water sourcesValeur0.000.00500.00
    Date10 novembre 20218 décembre 202330 juin 2027
    Observation
  • Short-term employment generated (gender disaggregated)Valeur0.000.0078400.00
    Date10 novembre 20218 décembre 202330 juin 2027
    Observation
  • Reduction in costs of land registrationValeur0.000.0025.00
    Date10 novembre 20218 décembre 202330 juin 2027
    Observation
  • Increase in land regularization titles, of which share of females holding secure occupancy rights (including co-tenancy with spouses)Valeur0.000.0090.00
    Date8 décembre 20218 décembre 202330 juin 2027
    Observation
  • Five-year operational plan for informal settlement regularization completedValeurNoNoYes
    Date10 novembre 20218 décembre 202330 juin 2027
    Observation
  • Citizens per settlement who have enhanced understanding of the climate and disaster risk reduction interventions as reflected in the survey assessment (disaggregated by gender)Valeur0.000.0070.00
    Date23 novembre 20218 décembre 202330 juin 2027
    Observation
  • Women holding registered leases (including co-tenancy with spouses) in project areasValeur0.000.0020.00
    Date24 novembre 20218 décembre 202330 juin 2027
    Observation
  • Share of short-term employment allocated to womenValeur0.000.0015.00
    Date24 novembre 20218 décembre 202330 juin 2027
    Observation
  • Female beneficiaries that feel that project investments reflected their needsValeur0.000.0070.00
    Date24 novembre 20218 décembre 202330 juin 2027
    Observation