Skip to Main Navigation

Sava and Drina Rivers Corridors Integrated Development Program

Résumé*

This project (Phase I of the SDIP MPA Program) will focus on four pillars of activities: 1) integrated management and development of the Sava River Corridor; 2) integrated management and development of the Drina River Corridor; 3) Project preparation and management; and 4) Enabling regional cooperation. Phase I activities have been identified and prepared through ongoing Bank support in the region as well as other initiatives financed by national...

* Le résumé de projet étant tiré du document d'évaluation de projet (PAD), du rapport d'évaluation (SAR) ou du document du programme (PGD), il peut ne pas refléter exactement la teneur du projet en son état actuel.

Voir plus

Objectif de développement

The Objective of the Project (Phase I of the Program) is to improve flood protection and enhance transboundary water cooperation in the Sava and Drina Rivers Corridors.

Clé Détails

Projet Détails

  • P168862

  • Active

  • Martin Albrecht , Andrew Losos, IGOR PALANDZIC

  • Republic of Serbia,Bosnia and Herzegovina

  • Western Balkans

  • 22 mars 2019

  • (à la date de présentation au Conseil)

    6 août 2020

  • 26 janvier 2021

  • USD 151.50 millions

  • Republic of Serbia Ministry of Agriculture, Forestry and Water Management,Montenegro Ministry of Agriculture and Rural Development,Republika Srpska Ministry of Agriculture, Forestry and Water,International Sava River Basin Commission,FBiH Ministry of Agriculture, Water Management and Forestry,Br?ko District,Republic of Serbia Ministry of Construction, Transport and Infrastructure

  • Europe et Asie centrale

  • 2021

  • USD 133.90 millions

  • N/A

  • 24 juin 2024

  • 30 novembre 2027

  • No

  • BANK APPROVED

  • Notes

Finances

Plan De Financement (Millions De Dollars)

Pas de données disponibles.
Org. De Financement Engagements
International Bank for Reconstruction and Development 133.90

Financement total du projet (USD millions)

Type de produit/service BIRD/IDA
Engagement BIRD 133.90
Engagement IDA N/D
Engagement BIRD + IDA 133.90
Instrument de prêt
Élément don N/D
Coût total du projet** 151.50

État récapitulatif du financement de la Banque (USD millions) au 31 mars 2025

Télécharger:
Pas de données disponibles.
Org. De Financement Date D'approbation Date De Cloture Montant En Principal Décaissé Remboursements Intérêts, Charges Et Commissions Financières

Activité financière détaillée au 31 mars 2025

Télécharger:
Pas de données disponibles.
Période Org. De Financement Type De Transaction Montant (USD)

Footnotes

Ratings

EXÉCUTION DU PROJET

Name Review Date
Progress towards achievement of PDO Moderately Satisfactory 2025-02-04
Financial Management Satisfactory 2025-02-04
Monitoring and Evaluation Moderately Satisfactory 2025-02-04
Project Management Moderately Satisfactory 2025-02-04
Procurement Moderately Satisfactory 2025-02-04
Overall Implementation Progress (IP) Moderately Unsatisfactory 2025-02-04

FIN D’EXÉCUTION DU PROJET

Pas de données disponibles.

NOTATION DE L’ÉVALUATION INDÉPENDANTE

Pas de données disponibles.

Cadre de résultats

INDICATEURS DES OBJECTIFS DE DÉVELOPPEMENT DU PROJET

INDICATEURNIVEAU DE RÉFÉRENCE EN COURS OBJECTIF
  • River basin management plan reflecting integrated measures updated and endorsed by countriesValeurNoYesYes
    Date31 janvier 202014 juin 202430 juillet 2026
    Observation
  • People protected from 1 in 100-year flood event in the Sava and Drina River Basins under the project (of which female)Valeur0.000.00270000.00
    Date31 janvier 202014 juin 202430 juillet 2026
    Observation
  • Of which femaleValeur0.000.000.00
    Date
    Observation
  • Area protected by flood risk mitigation measures under the projectValeur0.000.00165000.00
    Date31 janvier 202014 juin 202430 juillet 2026
    Observation

INDICATEURS DE RÉSULTATS INTERMÉDIAIRES

INDICATEURNIVEAU DE RÉFÉRENCE EN COURS OBJECTIF
  • Length of embankments or dykes constructed or rehabilitatedValeur0.001.5030.00
    Date31 janvier 202014 juin 202430 juillet 2026
    Observation
  • Enhanced monitoring/ data sharing protocols and schedules developedValeurNoNoYes
    Date31 janvier 202014 juin 202430 juillet 2026
    Observation
  • Freight throughput at the Sava river port of Sremska Mitrovica in SerbiaValeur234465.00234465.00300000.00
    Date2 mars 202014 juin 202430 janvier 2026
    Observation
  • Flood monitoring and forecasting system upgraded in a participatory manner, publicly disclosed and adjusted based on citizen engagementValeurNoNoYes
    Date31 janvier 202027 juin 202430 juillet 2026
    Observation
  • Priority regional investments preparedValeur0.000.005.00
    Date31 janvier 202014 juin 202430 juillet 2026
    Observation
  • Percentage of grievances responded and resolved within an agreed time frameValeur0.00100.0085.00
    Date31 janvier 202027 juin 202430 juillet 2026
    Observation
  • Stakeholders consulted (of which female) and engaged during planning and preparation of project interventionsValeur0.00200.001200.00
    Date31 janvier 202014 juin 202430 juillet 2026
    Observation
  • Area protected by improved solid waste managementValeur0.000.0031.50
    Date6 juillet 202314 juin 202430 juillet 2026
    Observation
  • of which femaleValeur0.0098.00510.00
    Date30 septembre 201914 juin 202430 juillet 2026
    Observation
  • Waterway improved through deminingValeur0.000.0040.00
    Date31 janvier 202014 juin 202430 juillet 2026
    Observation
  • Regional tourism master plan for the Sava and Drina Corridor that includes the establishment of a forum for women-headed SMEs is developed and endorsed..ValeurNoNoYes
    Date31 janvier 202014 juin 202430 juillet 2026
    Observation
  • Number of annual multi-national stakeholder workshops heldValeur0.000.0012.00
    Date1 janvier 202014 juin 202430 janvier 2026
    Observation