Skip to Main Navigation

Sint Maarten Emergency Recovery Project I

Résumé*

The development objective of First Phase of Emergency Recovery Project is to contribute to Sint Maarten’s immediate emergency recovery needs and strengthen institutional capacity to manage resilient recovery and reconstruction. There are four components in this project. 1) The first component, Emergency measures for the recovery of disaster first responders and preparedness facilities, has the following subcomponents : (i) Critical disaster preparedness...

* Le résumé de projet étant tiré du document d'évaluation de projet (PAD), du rapport d'évaluation (SAR) ou du document du programme (PGD), il peut ne pas refléter exactement la teneur du projet en son état actuel.

Voir plus

Objectif de développement

The Project Development Objective (PDO) is to contribute to Sint Maarten’s immediate emergency recovery needs and strengthen institutional capacity to manage resilient recovery and reconstruction.

Clé Détails

Projet Détails

  • P167339

  • Active

  • Suranga Kahandawa , Giuliana De Mendiola Ramirez

  • Sint Maarten National Recovery Program Bureau

  • St Maarten

  • 20 décembre 2018

  • (à la date de présentation au Conseil)

    10 juillet 2018

  • 18 juillet 2018

  • USD 55.20 millions

  • National Recovery Program Bureau,Sint Maarten National Recovery Program Bureau

  • Amérique latine et Caraïbes

  • 2019

  • USD 100.20 millions

  • B

  • 7 mai 2024

  • 31 décembre 2025

  • Yes

  • BANK APPROVED

  • Notes

Finances

Plan De Financement (Millions De Dollars)

Pas de données disponibles.
Org. De Financement Engagements
Free-standing Single Purpose Trust Fund 100.20

Financement total du projet (USD millions)

Type de produit/service BIRD/IDA
Engagement BIRD N/D
Engagement IDA N/D
Engagement BIRD + IDA N/D
Instrument de prêt
Élément don 100.20
Coût total du projet** 55.20

État récapitulatif du financement de la Banque (USD millions) au 28 février 2025

Télécharger:
Pas de données disponibles.
Org. De Financement Date D'approbation Date De Cloture Montant En Principal Décaissé Remboursements Intérêts, Charges Et Commissions Financières

Activité financière détaillée au 28 février 2025

Télécharger:
Pas de données disponibles.
Période Org. De Financement Type De Transaction Montant (USD)

Footnotes

Ratings

EXÉCUTION DU PROJET

Name Review Date
Procurement Moderately Satisfactory 2024-12-17
Progress towards achievement of PDO Moderately Satisfactory 2024-12-17
Monitoring and Evaluation Moderately Unsatisfactory 2024-12-17
Project Management Satisfactory 2024-12-17
Financial Management Satisfactory 2024-12-17
Overall Implementation Progress (IP) Moderately Satisfactory 2024-12-17

FIN D’EXÉCUTION DU PROJET

Pas de données disponibles.

NOTATION DE L’ÉVALUATION INDÉPENDANTE

Pas de données disponibles.

Cadre de résultats

INDICATEURS DES OBJECTIFS DE DÉVELOPPEMENT DU PROJET

INDICATEURNIVEAU DE RÉFÉRENCE EN COURS OBJECTIF
  • Share of households with electrical services resilient to hurricanesValeur80.0089.5089.00
    Date1 juin 201815 novembre 202331 décembre 2025
    Observation
  • Water storage capacity of Sint Maarten utilities (average daily demand)Valeur0.701.701.70
    Date1 juin 201815 novembre 202331 mai 2023
    Observation
  • Number of citizens benefitting from the investments in emergency response system strengtheningValeur0.0040.0040.00
    Date1 juin 201815 novembre 202331 décembre 2025
    Observation
  • Percentage of beneficiaries that are satisfied with the quality of housing repairs (gender disaggregated)Valeur0.0089.0080.00
    Date1 juin 201815 novembre 202331 mai 2023
    Observation
  • Percentage of women satisfied with the quality of housing repairsValeur0.0087.0080.00
    Date20 mars 202315 novembre 202331 décembre 2025
    Observation
  • NRPB is established and fully operationalValeurNoYesYes
    Date1 juin 201815 décembre 202231 mai 2023
    Observation
  • Number of citizens directly benefitting from the project investmentsValeur0.005867.0010000.00
    Date1 juin 201815 novembre 202331 décembre 2025
    Observation
  • Number of women directly benefitting from the project investmentsValeur0.002346.004000.00
    Date1 juin 201815 novembre 202331 décembre 2025
    Observation

INDICATEURS DE RÉSULTATS INTERMÉDIAIRES

INDICATEURNIVEAU DE RÉFÉRENCE EN COURS OBJECTIF
  • Number of sports facilities repaired to more resilient standardsValeur0.000.0013.00
    Date22 février 202315 novembre 202331 décembre 2025
    Observation
  • Percentage of which are womenValeur0.0060.0050.00
    Date1 juin 201815 novembre 202331 décembre 2025
    Observation
  • Number of school gyms repaired to more resilient standardsValeur0.000.0012.00
    Date22 février 202315 novembre 202331 décembre 2025
    Observation
  • Civil protection/first responder’s buildings repaired with more resilient standardsValeur0.003.003.00
    Date1 juin 201815 décembre 202230 juin 2025
    Observation
  • Water tanks built to hurricane resistant standardsValeur0.004.004.00
    Date1 juin 201815 décembre 20221 mai 2023
    Observation
  • Housing units repaired to more resilient standardsValeur0.00509.00512.00
    Date1 juin 201815 novembre 202328 juin 2024
    Observation
  • Years of access to a sovereign catastrophe risk insuranceValeur0.005.005.00
    Date1 juin 201815 novembre 202331 mai 2023
    Observation
  • Emergency shelters repaired with more resilient standardsValeur0.0011.0011.00
    Date1 juin 201815 décembre 202229 décembre 2023
    Observation
  • Total length of trenching for underground electricity distribution cablesValeur0.009.2016.00
    Date1 juin 201815 novembre 202331 décembre 2024
    Observation
  • Number of schools repaired to more resilient standardsValeur0.0012.0019.00
    Date1 juin 201815 novembre 202328 juin 2024
    Observation
  • Core NRPB staff positions filled (gender disaggregated)Valeur0.00100.00100.00
    Date1 juin 201815 novembre 202331 décembre 2025
    Observation