Skip to Main Navigation

Enhancing Waterway Connectivity and Water Service Provision in Colombia’s Plan Pazcifico

Résumé*

The objective of the Enhancing Waterway Connectivity and Water Service Provision in Pazcifico Project for Colombia is to improve: (a) waterway transport; and (b) coverage and quality of water supply and sanitation services, in the Participating Municipalities. There are four components to the project, the first component being improving waterway transport in participating municipalities. This component includes two subcomponents: improving waterway...

* Le résumé de projet étant tiré du document d'évaluation de projet (PAD), du rapport d'évaluation (SAR) ou du document du programme (PGD), il peut ne pas refléter exactement la teneur du projet en son état actuel.

Voir plus

Objectif de développement

The Project Development Objective (PDO) is to improve: (i) waterway transport; and (ii) coverage and quality of water supply and sanitation services, in the Participating Municipalities.

Clé Détails

Projet Détails

  • P156880

  • Active

  • Linda Ivarsson Molina , Veronique Verdeil

  • FTSP, represented by its Fiduciary Agent and Trustee FIDUCIARIA LA PREVISORA, S.A. (FIDUPREVISORA)

  • Colombie

  • 4 octobre 2017

  • (à la date de présentation au Conseil)

    14 décembre 2017

  • 8 novembre 2019

  • USD 41.90 millions

  • Ministry of Equality and Equity (Ministerio de Igualdad y Equidad - MIE)

  • Amérique latine et Caraïbes

  • 2018

  • USD 41.90 millions

  • B

  • 15 décembre 2023

  • 15 octobre 2025

  • Yes

  • BANK APPROVED

  • Notes

Finances

Plan De Financement (Millions De Dollars)

Pas de données disponibles.
Org. De Financement Engagements
International Bank for Reconstruction and Development 41.90

Financement total du projet (USD millions)

Type de produit/service BIRD/IDA
Engagement BIRD 41.90
Engagement IDA N/D
Engagement BIRD + IDA 41.90
Instrument de prêt
Élément don N/D
Coût total du projet** 41.90

État récapitulatif du financement de la Banque (USD millions) au 28 février 2025

Télécharger:
Pas de données disponibles.
Org. De Financement Date D'approbation Date De Cloture Montant En Principal Décaissé Remboursements Intérêts, Charges Et Commissions Financières

Activité financière détaillée au 28 février 2025

Télécharger:
Pas de données disponibles.
Période Org. De Financement Type De Transaction Montant (USD)

Footnotes

Ratings

EXÉCUTION DU PROJET

Name Review Date
Project Management Unsatisfactory 2025-01-08
Financial Management Moderately Satisfactory 2025-01-08
Monitoring and Evaluation Moderately Satisfactory 2025-01-08
Overall Implementation Progress (IP) Unsatisfactory 2025-01-08
Progress towards achievement of PDO Unsatisfactory 2025-01-08
Procurement Moderately Unsatisfactory 2025-01-08

FIN D’EXÉCUTION DU PROJET

Pas de données disponibles.

NOTATION DE L’ÉVALUATION INDÉPENDANTE

Pas de données disponibles.

Cadre de résultats

INDICATEURS DES OBJECTIFS DE DÉVELOPPEMENT DU PROJET

INDICATEURNIVEAU DE RÉFÉRENCE EN COURS OBJECTIF
  • People provided with access to improved water sourcesValeur0.000.0013078.00
    Date19 octobre 201727 novembre 202315 octobre 2025
    Observation
  • Female beneficiariesValeur0.000.0050.00
    Date19 octobre 201715 décembre 2023
    Observation
  • Direct project beneficiaries with access to docks that incorporate universal accessibility standards, safe operation and resilient infrastructureValeur0.000.0092000.00
    Date15 décembre 202315 décembre 202315 octobre 2025
    Observation
  • People in urban areas provided with access to “improved sanitation facilities” under the Project, of which women (% coverage)Valeur0.000.007350.00
    Date19 octobre 201727 novembre 202315 octobre 2025
    Observation
  • Satisfaction of the users using the docksValeur0.000.0080.00
    Date15 décembre 202327 décembre 202315 octobre 2025
    Observation
  • Female beneficiariesValeur0.000.0050.00
    Date19 octobre 201715 décembre 2023
    Observation
  • Satisfaction of women using the passenger docksValeur0.000.000.00
    Date
    Observation
  • Satisfaction of the users using the cargo docksValeur0.000.000.00
    Date
    Observation
  • Change in the average cargo transfer times at the docks (%)Valeur0.000.00-15.00
    Date15 décembre 202315 décembre 202315 octobre 2025
    Observation

INDICATEURS DE RÉSULTATS INTERMÉDIAIRES

INDICATEURNIVEAU DE RÉFÉRENCE EN COURS OBJECTIF
  • Number of beneficiary municipalities with docks built, of which include gender based violence prevention environmental design and the specific needs of the elders and people with disabilitiesValeur0.000.005.00
    Date19 octobre 201727 novembre 202315 décembre 2023
    Observation
  • Number of waterway operators with license (formalization)Valeur0.000.00240.00
    Date19 octobre 201727 novembre 202315 décembre 2023
    Observation
  • New piped household water connections that are resulting from Project interventionValeur0.000.004117.00
    Date19 octobre 201727 novembre 202315 octobre 2025
    Observation
  • Number of women waterway operators with license (formalization)Valeur0.000.0036.00
    Date15 décembre 202327 novembre 202315 octobre 2025
    Observation
  • Feasibility/design studies for the Francisco Pizarro water system have been validated by MVCTValeurNoNoYes
    Date20 juin 202327 novembre 202315 octobre 2025
    Observation
  • Water supply continuity in project areas (hours per day)Valeur2 hour per day2 hours per day22 hours per day
    Date19 octobre 201727 novembre 202315 octobre 2025
    Observation
  • Indicative and informative signals implementedValeur0.000.00100.00
    Date19 octobre 201727 novembre 202315 décembre 2023
    Observation
  • Number of transport operators trained (safety transport operation and docks management which incorporate a gender approach)Valeur0.000.0080.00
    Date19 octobre 201718 mai 202315 octobre 2025
    Observation
  • Level of non-revenue water in project areas (%)ValeurNo Datano data< 30 %
    Date19 octobre 201727 novembre 202315 octobre 2025
    Observation
  • Beneficiaries that attended meetings on the design construction and maintenance of the infrastructure (docks and WSS)Valeur60.0080.0090.00
    Date7 octobre 202027 novembre 202315 octobre 2025
    Observation
  • Share of complaints that were attended to in a timely manner according to the Grievance Redress MechanismValeur0.000.00100.00
    Date15 décembre 202327 novembre 202315 octobre 2025
    Observation
  • New household sewer connections constructed under the ProjectValeur0.000.00740.00
    Date19 octobre 201727 novembre 202315 décembre 2023
    Observation
  • Number of municipalities with administration, operation and maintenance models for the river docksValeur0.001.005.00
    Date15 décembre 202315 août 202315 octobre 2025
    Observation
  • Feasibility/design studies for the sewerage systems of Timbiqui and Francisco Pizarro have been validated by MVCTValeurNoNoYes
    Date20 juin 202327 novembre 202315 octobre 2025
    Observation
  • WSS Institutional and Operational Management Model for Timbiqui developed and in implementation (Yes/No)ValeurNoNoYes
    Date19 octobre 201727 novembre 202315 octobre 2025
    Observation
  • Activities of the Gender-Based Violence Plan implemented in each municipalityValeur0.0010.0080.00
    Date15 décembre 202327 novembre 202315 octobre 2025
    Observation
  • Percentage of women employed through the projectValeur0.0028.0020.00
    Date19 octobre 201727 novembre 202315 octobre 2025
    Observation