Kananga Emergency Urban Resilience Project

Résumé*

The project will intervene in two phases, which will start immediately after approval, in collaboration with affected communities: (a) phase 1 – emergency response, which includes activities to restrict access to erosion gullies and surrounding areas, stabilize soils and arrest further erosion, prevent landslides, and to the extent possible improve management of drainage of surface water; and (b) phase 2 – restoring and improving resilience of urban...

* Le résumé de projet étant tiré du document d'évaluation de projet (PAD), du rapport d'évaluation (SAR) ou du document du programme (PGD), il peut ne pas refléter exactement la teneur du projet en son état actuel.

Voir plus

Objectif de développement

The objectives of the Project are to safeguard houses and critical infrastructure affected by gully erosion in Kananga and strengthen the capacity of the Recipient's Government and local organizations in erosion management and climate resilient urban planning.

Clé Détails

Projet Détails

  • P179292

  • Active

  • Keren Charles , Tahir Akbar

  • Ministry of Finance

  • Congo, République démocratique du

  • 12 septembre 2022

  • (à la date de présentation au Conseil)

    30 septembre 2022

  • 8 mai 2023

  • USD 100.00 millions

  • Ministry of Urban Planning and Housing

  • Eastern and Southern Africa

  • 2023

  • USD 100.00 millions

  • N/A

  • 27 février 2024

  • 15 décembre 2027

  • Yes

  • BANK APPROVED

  • Notes

Finances

Plan De Financement (Millions De Dollars)

Pas de données disponibles.
Org. De Financement Engagements
IDA Credit 100.00

Financement total du projet (USD millions)

Type de produit/service BIRD/IDA
Engagement BIRD N/D
Engagement IDA 100.00
Engagement BIRD + IDA 100.00
Instrument de prêt
Élément don N/D
Coût total du projet** 100.00

État récapitulatif du financement de la Banque (USD millions) au 28 février 2025

Télécharger:
Pas de données disponibles.
Org. De Financement Date D'approbation Date De Cloture Montant En Principal Décaissé Remboursements Intérêts, Charges Et Commissions Financières

Activité financière détaillée au 28 février 2025

Télécharger:
Pas de données disponibles.
Période Org. De Financement Type De Transaction Montant (USD)

Footnotes

Ratings

EXÉCUTION DU PROJET

Name Review Date
Financial Management Moderately Unsatisfactory 2024-06-04
Monitoring and Evaluation Moderately Satisfactory 2024-06-04
Overall Implementation Progress (IP) Moderately Unsatisfactory 2024-06-04
Progress towards achievement of PDO Moderately Unsatisfactory 2024-06-04
Project Management Moderately Unsatisfactory 2024-06-04
Procurement Unsatisfactory 2024-06-04

FIN D’EXÉCUTION DU PROJET

Pas de données disponibles.

NOTATION DE L’ÉVALUATION INDÉPENDANTE

Pas de données disponibles.

Cadre de résultats

INDICATEURS DES OBJECTIFS DE DÉVELOPPEMENT DU PROJET

INDICATEURNIVEAU DE RÉFÉRENCE EN COURS OBJECTIF
  • Houses safeguarded from soil erosion due to gully stabilization measuresValeur0.000.001300.00
    Date25 août 202213 février 202329 octobre 2027
    Observation
  • Climate risk-informed urban and land-use plans developed with contributions from beneficiary communities and adoptedValeur0.000.003.00
    Date25 août 202213 février 202329 octobre 2027
    Observation
  • Critical infrastructure protected from soil erosion due to newly built gully control measuresValeur0.000.0023.00
    Date25 août 202213 février 202329 octobre 2027
    Observation
  • Development and implementation of a comprehensive capacity strengthening plan for authorities and other stakeholdersValeur0.000.0095.00
    Date25 août 202213 février 202329 octobre 2027
    Observation
  • Local development and erosion prevention committees institutionalized and effectively operatingValeur0.000.0027.00
    Date25 août 202213 février 202329 octobre 2027
    Observation
  • Of which leaders that are femaleValeur0.000.000.00
    Date
    Observation
  • Of which female participationValeur0.000.000.00
    Date
    Observation

INDICATEURS DE RÉSULTATS INTERMÉDIAIRES

INDICATEURNIVEAU DE RÉFÉRENCE EN COURS OBJECTIF
  • Emergency sites intervened to safeguard access routes in the first six monthsValeur0.003.003.00
    Date25 août 202213 février 202331 mars 2023
    Observation
  • People provided with improved urban living conditionsValeur0.000.0045000.00
    Date25 août 202213 février 202329 octobre 2027
    Observation
  • Length of structural and geotechnical works to stabilize gulliesValeur0.000.0010.00
    Date25 août 202213 février 202329 octobre 2027
    Observation
  • Erosion risk assessment studies conducted (Kananga and other priority cities)Valeur0.001.005.00
    Date25 août 202213 février 202329 octobre 2027
    Observation
  • Length of hydraulic works to manage run-off and gully controlValeur0.000.0020.00
    Date25 août 202213 février 202329 octobre 2027
    Observation
  • Operational monitoring tools (geodesic, meteorological, hydrological)Valeur0.000.003.00
    Date25 août 202213 février 202329 octobre 2027
    Observation
  • Targeted land treated with nature-based solutions for gully protectionValeur0.000.008.00
    Date25 août 202213 février 202329 octobre 2027
    Observation
  • Rehabilitated/reconstructed gully affected infrastructureValeur0.000.0010.00
    Date25 août 202213 février 202329 octobre 2027
    Observation
  • Newly constructed urban infrastructureValeur0.000.0010.00
    Date25 août 202213 février 202329 octobre 2027
    Observation
  • Community participation in the processes of urban planning and emergency preparedness and responseValeur0.000.0030.00
    Date25 août 202213 février 202329 octobre 2027
    Observation
  • Of which femaleValeur0.000.000.00
    Date
    Observation
  • Key staff trained for operation and maintenance of urban infrastructure provided by the projectValeur0.000.00200.00
    Date25 août 202213 février 202329 octobre 2027
    Observation
  • Of which femaleValeur0.000.000.00
    Date
    Observation
  • Labor-intensive work-days created through the projectValeur0.000.002500000.00
    Date25 août 202213 février 202329 octobre 2027
    Observation
  • Of which femaleValeur0.000.000.00
    Date
    Observation
  • Registered grievances appropriately addressedValeur0.0083.00100.00
    Date25 août 202213 février 202329 octobre 2027
    Observation