Burundi Transport Resilience Project

Résumé*

Through the rehabiliation of a key road corridor for the country with climate resilient stndards and interventions to promote non motorized mobility and safety, , the Project objectives are to improving the Climate Resilience of Road Infrastructure ; to adress rove non-motorized mobility and road safety in the project area ; and to enhance the capacity to manage, plan and finance risks related to natural disasters. The project intervention area covers...

* Le résumé de projet étant tiré du document d'évaluation de projet (PAD), du rapport d'évaluation (SAR) ou du document du programme (PGD), il peut ne pas refléter exactement la teneur du projet en son état actuel.

Voir plus

Objectif de développement

The Project Development Objectives (PDO) are to provide efficient, safe and climate resilient road connectivity along the main corridor linking Burundi with Tanzania, and to strengthen the institutional capacity to sustainably plan, develop, and preserve climate resilient road assets.

Clé Détails

Projet Détails

  • P172988

  • Active

  • Francis Ovanda Mbele , Peter Taniform

  • Ministry of Finance, Budget and Economic Planification

  • Burundi

  • 18 décembre 2020

  • (à la date de présentation au Conseil)

    30 septembre 2022

  • 10 mai 2023

  • USD 120.00 millions

  • Ministry of Infrastructure, Equipment and Housing,Ministry of Trade, Transport, Industry and Tourism

  • Eastern and Southern Africa

  • 2023

  • USD 120.00 millions

  • N/A

  • 21 février 2024

  • 31 décembre 2027

  • Yes

  • BANK APPROVED

  • Notes

Finances

Plan De Financement (Millions De Dollars)

Pas de données disponibles.
Org. De Financement Engagements
IDA Grant 120.00

Financement total du projet (USD millions)

Type de produit/service BIRD/IDA
Engagement BIRD N/D
Engagement IDA 120.00
Engagement BIRD + IDA 120.00
Instrument de prêt
Élément don N/D
Coût total du projet** 120.00

État récapitulatif du financement de la Banque (USD millions) au 28 février 2025

Télécharger:
Pas de données disponibles.
Org. De Financement Date D'approbation Date De Cloture Montant En Principal Décaissé Remboursements Intérêts, Charges Et Commissions Financières

Activité financière détaillée au 28 février 2025

Télécharger:
Pas de données disponibles.
Période Org. De Financement Type De Transaction Montant (USD)

Footnotes

Ratings

EXÉCUTION DU PROJET

Name Review Date
Project Management Satisfactory 2025-02-17
Progress towards achievement of PDO Satisfactory 2025-02-17
Monitoring and Evaluation Satisfactory 2025-02-17
Overall Implementation Progress (IP) Satisfactory 2025-02-17
Procurement Moderately Satisfactory 2025-02-17
Financial Management Moderately Satisfactory 2025-02-17

FIN D’EXÉCUTION DU PROJET

Pas de données disponibles.

NOTATION DE L’ÉVALUATION INDÉPENDANTE

Pas de données disponibles.

Cadre de résultats

INDICATEURS DES OBJECTIFS DE DÉVELOPPEMENT DU PROJET

INDICATEURNIVEAU DE RÉFÉRENCE EN COURS OBJECTIF
  • 1. Travel time in NR-3 Bujumbura-Gitaza road section.Valeur50.0050.0025.00
    Date31 mai 202229 septembre 202331 décembre 2026
    Observation
  • 4. Percentage of the Burundian section of the Central Corridor to Tanzania Dar Sea Port in good and fair conditionValeur27.0027.0090.00
    Date31 mai 202229 septembre 202331 décembre 2026
    Observation
  • 2. Number of crash fatalities along the NR-3 sectionValeur50.0050.0015.00
    Date31 mai 202229 septembre 202331 décembre 2026
    Observation
  • 5. People benefiting from improved climate resilient roadsValeur0.000.00550000.00
    Date31 mai 202229 septembre 202331 décembre 2026
    Observation
  • 3. Number of days annually NR-3 Bujumbura-Gitaza section is impassableValeur5.005.000.00
    Date12 avril 202229 septembre 202331 décembre 2027
    Observation
  • People benefiting from improved climate resilient road who are womenValeur0.000.000.00
    Date
    Observation

INDICATEURS DE RÉSULTATS INTERMÉDIAIRES

INDICATEURNIVEAU DE RÉFÉRENCE EN COURS OBJECTIF
  • Road safety strategy and action plan preparedValeurNoNoYes
    Date8 avril 202229 septembre 202331 décembre 2027
    Observation
  • Length of climate resilient road sections rehabilitated/upgraded in compliance with standards and technical specifications defined in works contractsValeur0.000.0025.00
    Date31 mai 202229 septembre 202331 décembre 2026
    Observation
  • Climate Resilient Road Infrastructure and Logistics Master Plan (CR-RILMP), and Climate Resilient Integrated Road Infrastructure and Logistics Strategy (CR-IRILS) developed and adoptedValeurNoNoYes
    Date8 avril 202229 septembre 202331 décembre 2027
    Observation
  • Length of road network safety assessedValeur0.000.003500.00
    Date8 avril 202229 septembre 202331 décembre 2027
    Observation
  • Length of Pilot Road sections upgraded to include NMT facilitiesValeur0.000.004.00
    Date8 avril 202229 septembre 202331 décembre 2027
    Observation
  • Number of people enrolled in the First Generation of Climate Resilient Transport Specialists ProgramsValeur0.000.0050.00
    Date8 avril 202229 septembre 202331 décembre 2027
    Observation
  • Pilot vehicle Crash data recording and analysis system installedValeurNoNoYes
    Date8 avril 202229 septembre 202331 décembre 2027
    Observation
  • Number of social infrastructure implementedValeur0.000.005.00
    Date8 avril 202229 septembre 202331 décembre 2027
    Observation
  • Share of people enrolled in the Program that are womenValeur0.000.000.00
    Date
    Observation
  • Storage/market facilities reserved/leased for womenValeur0.000.0030.00
    Date20 mai 202229 septembre 202331 décembre 2026
    Observation
  • Percentage of graduates who report being employed 12 months after they complete the internship of which are womenValeur0.000.000.00
    Date
    Observation
  • Percentage of consultations conducted with women and groups in a situation of vulnerability,to select type and locations of social servicesValeur0.000.00100.00
    Date20 mai 202229 septembre 202331 décembre 2027
    Observation
  • Construction workers on project site who have signed the code of conduct (CoC) and attended the CoC trainingValeur0.000.00100.00
    Date8 avril 202229 septembre 202331 décembre 2027
    Observation
  • System is in place to receive and log grievances related to design, construction and operations of project road sections including GBV, within the stipulated servicesValeurNoNoYes
    Date8 avril 202229 septembre 202331 décembre 2027
    Observation
  • Percentage of graduates who report being employed 12 months after they complete the internship of which are womenValeur0.000.0020.00
    Date20 mai 202229 septembre 202331 décembre 2026
    Observation