Luanda Bita Water Supply Guarantee Project

Résumé*

The development objective of the Luanda Bita Water Supply Guarantee Project for Angola is to improve access to potable water service in selected areas of Luanda by mobilizing commercial financing for the Government of Angola. The project consists of one component, first phase of the Bita Project, which will develop water supply infrastructure to supply currently unserved urbanized and urbanizing areas of South Luanda.

* Le résumé de projet étant tiré du document d'évaluation de projet (PAD), du rapport d'évaluation (SAR) ou du document du programme (PGD), il peut ne pas refléter exactement la teneur du projet en son état actuel.

Voir plus

Objectif de développement

The Project Development Objective (PDO) is to improve access to potable water service in selected areas of Luanda by mobilizing commercial financing for the Government of Angola.

Clé Détails

Projet Détails

  • P163610

  • Active

  • Antonio Rodriguez Serrano , Philip Lam, Berta Macheve

  • Ministry of Finance

  • Angola

  • (à la date de présentation au Conseil)

    16 juillet 2019

  • USD 1090.00 millions

  • Empresa Publica de Aguas de Luanda, E.P. (EPAL),Ministry of Energy and Water

  • 19 décembre 2024

  • 30 juillet 2027

  • BANK APPROVED

  • Notes

Finances

Plan De Financement (Millions De Dollars)

Pas de données disponibles.
Org. De Financement Engagements
IBRD Guarantee 500.00
Borrower/Recipient 20.00

Financement total du projet (USD millions)

Type de produit/service BIRD/IDA
Engagement BIRD N/D
Engagement IDA N/D
Engagement BIRD + IDA N/D
Instrument de prêt
Élément don N/D
Coût total du projet** 1090.00

État récapitulatif du financement de la Banque (USD millions) au 31 décembre 2024

Télécharger:
Pas de données disponibles.
Org. De Financement Date D'approbation Date De Cloture Montant En Principal Décaissé Remboursements Intérêts, Charges Et Commissions Financières

Activité financière détaillée au 31 décembre 2024

Télécharger:
Pas de données disponibles.
Période Org. De Financement Type De Transaction Montant (USD)

Footnotes

Ratings

EXÉCUTION DU PROJET

Name Review Date
Project Management Satisfactory 2024-11-12
Financial Management Moderately Unsatisfactory 2024-11-12
Progress towards achievement of PDO Moderately Satisfactory 2024-11-12
Procurement Satisfactory 2024-11-12
Overall Implementation Progress (IP) Moderately Satisfactory 2024-11-12
Monitoring and Evaluation Satisfactory 2024-11-12

FIN D’EXÉCUTION DU PROJET

Pas de données disponibles.

NOTATION DE L’ÉVALUATION INDÉPENDANTE

Pas de données disponibles.

Cadre de résultats

INDICATEURS DES OBJECTIFS DE DÉVELOPPEMENT DU PROJET

INDICATEURNIVEAU DE RÉFÉRENCE EN COURS OBJECTIF
  • People provided with access to improved water sourcesValeur0.000.00900000.00
    Date3 août 201930 avril 202423 novembre 2024
    Observation
  • People provided with access to improved water sources - Female (RMS requirement)Valeur0.000.000.00
    Date
    Observation
  • People provided with access to improved water sources - urbanValeur0.000.000.00
    Date
    Observation
  • People with existing connections benefitting from safely managed serviceValeur0.000.00500000.00
    Date16 juillet 201930 avril 202423 novembre 2024
    Observation
  • People with existing connections benefitting from safely managed service - FemaleValeur0.000.00250000.00
    Date16 juillet 201930 avril 202423 novembre 2024
    Observation
  • Percentage of tested samples passing water quality testsValeur0.000.0099.00
    Date16 juillet 201930 avril 202423 novembre 2024
    Observation
  • Commercial financing mobilizedValeur0.00217000000.001070000000.00
    Date16 juillet 201930 avril 202423 novembre 2024
    Observation

INDICATEURS DE RÉSULTATS INTERMÉDIAIRES

INDICATEURNIVEAU DE RÉFÉRENCE EN COURS OBJECTIF
  • People provided with new access to safely managed water serviceValeur0.000.00280000.00
    Date16 juillet 201930 avril 202423 novembre 2024
    Observation
  • People provided with new access to basic water serviceValeur0.000.00120000.00
    Date16 juillet 201930 avril 202423 novembre 2024
    Observation
  • Number of female and male person hours per day per household saved due to the water connectionValeur0.000.000.00
    Date16 juillet 201930 avril 202423 novembre 2024
    Observation
  • Installed water production capacityValeur0.000.0094608000.00
    Date16 juillet 201930 avril 202423 novembre 2024
    Observation
  • Length of distribution network constructed or rehabilitatedValeur0.000.003914.00
    Date16 juillet 201930 avril 202423 novembre 2024
    Observation
  • New metered household connections constructed in project areaValeur0.000.00180000.00
    Date16 juillet 201930 avril 202423 novembre 2024
    Observation
  • Household connections retrofitted with meter in project areaValeur0.000.0050000.00
    Date16 juillet 201930 avril 202423 novembre 2024
    Observation
  • Standpipes constructed or rehabilitated in project areaValeur0.000.00300.00
    Date16 juillet 201930 avril 202423 novembre 2024
    Observation
  • Customer grievances addressed satisfactorily within stipulated time frameValeur0.000.0050.00
    Date16 juillet 201930 avril 202423 novembre 2024