Skip to Main Navigation

Morocco Inclusive Green Growth DPL2

Résumé*

The presented operation is the second in a programmatic series of two single tranche development policy loans (DPLs). The series builds on solid sector dialogue over several years and strong government ownership of the program, as demonstrated by steady progress with the implementation of the reforms supported by DPL1. The DPL series supports a package of reforms pursuing three program development objectives (PDOs). These include: (i) improving the...

* Le résumé de projet étant tiré du document d'évaluation de projet (PAD), du rapport d'évaluation (SAR) ou du document du programme (PGD), il peut ne pas refléter exactement la teneur du projet en son état actuel.

Voir plus

Objectif de développement

The proposed DPL2 is the second in a programmatic series of two operations which supports the Government’s green growth agenda. TheProgram Development Objectives are: (i) improving the management of natural capital; (ii) greening physical capital and (iii) strengthening and diversifying the rural economy by leveraging human capital.

Clé Détails

Projet Détails

  • P149747

  • Closed

  • Maria Sarraf , Andrea Liverani

  • N/A

  • Maroc

  • 14 octobre 2015

  • (à la date de présentation au Conseil)

    18 décembre 2015

  • 12 janvier 2016

  • USD 300.00 millions

  • Ministry of Economy and Finance,Ministry of Energy Mines and Sustainable Development,Ministry of General Affairs and Governance

  • Moyen-Orient et Afrique du Nord

  • 2016

  • USD 300.00 millions

  • N/A

  • 6 décembre 2023

  • 31 décembre 2016

  • BANK APPROVED

  • P127956

  • Notes

Finances

Plan De Financement (Millions De Dollars)

Pas de données disponibles.
Org. De Financement Engagements
International Bank for Reconstruction and Development 300.00

Financement total du projet (USD millions)

Type de produit/service BIRD/IDA
Engagement BIRD 300.00
Engagement IDA N/D
Engagement BIRD + IDA 300.00
Instrument de prêt
Élément don N/D
Coût total du projet** 300.00

État récapitulatif du financement de la Banque (USD millions) au 31 mars 2025

Télécharger:
Pas de données disponibles.
Org. De Financement Date D'approbation Date De Cloture Montant En Principal Décaissé Remboursements Intérêts, Charges Et Commissions Financières

Activité financière détaillée au 31 mars 2025

Télécharger:
Pas de données disponibles.
Période Org. De Financement Type De Transaction Montant (USD)

Footnotes

Ratings

EXÉCUTION DU PROJET

Pas de données disponibles.

FIN D’EXÉCUTION DU PROJET

INDICATEURBILAN DE FIN D’EXÉCUTION ET DE RÉSULTATS: 04-30-2018
RésultatsModerately Satisfactory
Risques pour les résultats de développementModest
Performance de la BanqueModerately Satisfactory
Performance de l'emprunteurModerately Satisfactory
Performance de l’ÉtatNot Applicable
Organisme d'exécutionNot Applicable

NOTATION DE L’ÉVALUATION INDÉPENDANTE

INDICATEUREXAMEN RFE: 08-15-2018RAPPORT D’ÉVALUATION RÉTROSPECTIVE DE PROJET:
Évaluation Des RésultatsModerately Satisfactory N/a
Risques Pour Les Résultats De DéveloppementModestN/a
Performance De La BanqueModerately SatisfactoryN/a
Performance De L'emprunteurModerately SatisfactoryN/a
Performance De L’étatModerately SatisfactoryN/a
Organisme D'exécutionModerately SatisfactoryN/a
Qualité Des RfeSubstantialN/a
Qualité Du Suivi-évaluationSubstantialN/a

Cadre de résultats

INDICATEURS DES OBJECTIFS DE DÉVELOPPEMENT DU PROJET

INDICATEURNIVEAU DE RÉFÉRENCE EN COURS OBJECTIF

INDICATEURS DE RÉSULTATS INTERMÉDIAIRES

INDICATEURNIVEAU DE RÉFÉRENCE EN COURS OBJECTIF
  • Indicator 3: # of aquifers (nappes) in which groundwater abstraction is regulated by a groundwater agreement among water consumersValeur1.001.003.00
    Date2 décembre 201313 avril 201629 septembre 2017
    Observation
  • Indicator 4: Area (in m2) of new buildings integrating EE requirements and respecting thermal regulations for new buildingsValeur0.000.00400000.00
    Date2 décembre 201327 juin 201429 septembre 2017
    Observation
  • Indicator 10: # of polluting products subject to green taxes or to conventions promoting recycling value chainsValeur2.007.004.00
    Date2 décembre 201313 avril 201629 septembre 2017
    Observation
  • Indicator 14: # of ecotourism sector jobs created (gender disaggregated)Valeur0.000.00250.00
    Date2 décembre 201327 juin 201429 septembre 2017
    Observation
  • Indicator 5: Total capacity of distributed medium and low tension grid renewable energy systems (in MW)Valeur0.000.0010.00
    Date2 décembre 201327 juin 201429 septembre 2017
    Observation
  • Indicator 6: Total subsidy envelope to diesel, gasoline and in dustrial fuel (in % of GDP)Valeur3.003.000.00
    Date2 décembre 201327 juin 201429 septembre 2017
    Observation
  • Indicator 9: Reduction in industrial pollution (as measured by tons of BOD5 abated yearly)Valeur20.00144.00200.00
    Date2 décembre 201327 juin 201429 septembre 2017
    Observation
  • Indicator 11: Share of the envelope allocated to direct seeders in the total FDA envelope allocated to seeders (traditional and direct)Valeur0.000.006.00
    Date2 décembre 201327 juin 201429 septembre 2017
    Observation
  • Indicator 8: #of industries having submitted a funding request to the Voluntary Mechanism for Industrial DepollutionValeur0.007.003.00
    Date2 décembre 201313 avril 201629 septembre 2017
    Observation
  • Indicator 13: # of aquaculture sector jobs created (gender disaggregated)Valeur115.00300.00500.00
    Date2 décembre 201313 avril 201629 septembre 2017
    Observation
  • Indicator 7: Social Cohesion Funds allocation as share of the total budget (excluding debt service)Valeur0.630.001.34
    Date2 décembre 201329 septembre 2017
    Observation
  • Indicator 12: Share of DMN revenues from agro-meteorological servicesValeur1.500.009.00
    Date2 décembre 201329 septembre 2017
    Observation
  • Indicator1: # of regional coastal zone management plans (Schemas Regionaux d'Amenagement du Littoral) approvedValeur0.000.002.00
    Date2 décembre 201313 avril 201629 septembre 2017
    Observation
  • Indicator 2: # of regional maritime fisheries control plans approvedValeur0.000.0018.00
    Date2 décembre 201313 avril 201629 septembre 2017
    Observation