MA-Inclusive Green Growth DPL

Résumé*

This program document presents the First Inclusive Green Growth Development Policy Loan (DPL) Program to the Kingdom of Morocco in the amount of EURO 219.7 million (US$300 million equivalent). Over the last decade the country has made remarkable progress in achieving poverty reducing growth. However, given the efforts deployed by Morocco, the sustainability of its growth model can be strengthened. The Government is deploying efforts to foster inclusive...

* Le résumé de projet étant tiré du document d'évaluation de projet (PAD), du rapport d'évaluation (SAR) ou du document du programme (PGD), il peut ne pas refléter exactement la teneur du projet en son état actuel.

Voir plus

Objectif de développement

The Program Development Objectives of the programmatic DPL series are: PDO1. Improving the management of natural capital; PDO2. Greening physical capital; PDO3. Strengthening and diversifying the rural economy by leveraging human capital.

Clé Détails

Projet Détails

  • P127956

  • Closed

  • Andrea Liverani

  • N/A

  • Maroc

  • 19 décembre 2013

  • (à la date de présentation au Conseil)

    19 décembre 2013

  • 20 décembre 2013

  • USD 300.00 millions

  • Ministry of Economy and Finance,Ministry of General Affairs and Governance,Ministry of Energy Mines and Sustainable Development

  • Moyen-Orient et Afrique du Nord

  • 2014

  • USD 300.00 millions

  • N/A

  • 6 décembre 2023

  • 31 décembre 2014

  • BANK APPROVED

  • Notes

Finances

Plan De Financement (Millions De Dollars)

Pas de données disponibles.
Org. De Financement Engagements
International Bank for Reconstruction and Development 300.00

Financement total du projet (USD millions)

Type de produit/service BIRD/IDA
Engagement BIRD 300.00
Engagement IDA N/D
Engagement BIRD + IDA 300.00
Instrument de prêt
Élément don N/D
Coût total du projet** 300.00

État récapitulatif du financement de la Banque (USD millions) au 31 mars 2025

Télécharger:
Pas de données disponibles.
Org. De Financement Date D'approbation Date De Cloture Montant En Principal Décaissé Remboursements Intérêts, Charges Et Commissions Financières

Activité financière détaillée au 31 mars 2025

Télécharger:
Pas de données disponibles.
Période Org. De Financement Type De Transaction Montant (USD)

Footnotes

Ratings

EXÉCUTION DU PROJET

Name Review Date
Progress towards achievement of PDO Satisfactory 2014-08-25
Monitoring and Evaluation Satisfactory 2014-08-25
Overall Implementation Progress (IP) Satisfactory 2014-08-25
Program Management Satisfactory 2014-08-25

FIN D’EXÉCUTION DU PROJET

INDICATEURBILAN DE FIN D’EXÉCUTION ET DE RÉSULTATS: 04-30-2018
RésultatsModerately Satisfactory
Risques pour les résultats de développementModest
Performance de la BanqueModerately Satisfactory
Performance de l'emprunteurModerately Satisfactory
Performance de l’ÉtatNot Applicable
Organisme d'exécutionNot Applicable

NOTATION DE L’ÉVALUATION INDÉPENDANTE

INDICATEUREXAMEN RFE: 08-15-2018RAPPORT D’ÉVALUATION RÉTROSPECTIVE DE PROJET:
Évaluation Des RésultatsModerately Satisfactory N/a
Risques Pour Les Résultats De DéveloppementModestN/a
Performance De La BanqueModerately SatisfactoryN/a
Performance De L'emprunteurModerately SatisfactoryN/a
Performance De L’étatModerately SatisfactoryN/a
Organisme D'exécutionModerately SatisfactoryN/a
Qualité Des RfeSubstantialN/a
Qualité Du Suivi-évaluationSubstantialN/a

Cadre de résultats

INDICATEURS DES OBJECTIFS DE DÉVELOPPEMENT DU PROJET

INDICATEURNIVEAU DE RÉFÉRENCE EN COURS OBJECTIF

INDICATEURS DE RÉSULTATS INTERMÉDIAIRES

INDICATEURNIVEAU DE RÉFÉRENCE EN COURS OBJECTIF
  • # of regional coastal zone management plans approvedValeur0.000.002.00
    Date2 décembre 201327 juin 201430 décembre 2016
    ObservationICZM Law will soon be discussed in parliamentary commission and the related Decree prepared in parallel. The National Coastal ZoneManagement Plan will then be adopted, and declined into Regional plans.
  • # of regional maritime fisheries control and enforcementplans approvedValeur0.000.0018.00
    Date2 décembre 201327 juin 201430 décembre 2016
    ObservationThe Law on illegal fishing was promulgated by Parliament and published in the National Gazette on May 26, 2014. The NationalMonitoring Plan for Marine Fisheries is being prepared. Regional plans will follow.
  • # of aquifers (nappes) in which groundwater abstractionis regulated by an aquifer a greement among ‘large’ water consumersValeur1.001.003.00
    Date2 décembre 201327 juin 201430 décembre 2016
    Observation2 aquifer agreements (in Dakhla and Fès-Meknès) are in a very advanced stage.
  • % of new buildings (hospitals, residential, tertiary) builtafter the publication of the Decree and integrating EE requirementsValeur0.000.0050.00
    Date2 décembre 201327 juin 201430 décembre 2016
    ObservationAs the decree will enter into force one year after approval (November 2014, therefore no impact can be assessed at this stage).
  • # of products subject to green taxesValeur2.002.004.00
    Date2 décembre 201327 juin 201430 décembre 2016
    ObservationA dedicated working group between MoF and Department of Environment (with TA from the Bank) has met several times to narrow downthe list of products that would be candidates for green taxes.
  • # of ecotourism sector jobs created (2013-2016) gender disaggregatedValeur0.000.00100.00
    Date2 décembre 201327 juin 201423 décembre 2016
    ObservationThe MoU on the Qariati Program has been finalized and the financial commitment from several institutional partners confirmed. Thesignature should take place in September 2014. Given delays in the MOU signature, the end target will need to be revised downwards.
  • Total capacity of distributedmedium-and low-tensiongrid-connected photovoltaic systems (in MW)Valeur0.000.002.00
    Date2 décembre 201327 juin 201430 décembre 2016
    ObservationThe analytical studies underpinning the draft Law and the Decree will be shared with the Bank team by the end of July.
  • Total subsidy envelope todiesel, gasoline and in dustrial fuel (in % of GDP)Valeur3.003.002.50
    Date2 décembre 201327 juin 201430 décembre 2016
    ObservationThe Government has implemented further subsidy reductions on gasoline, diesel and HFO.
  • Reduction in industrial pollution (as measured by tons ofBOD5 abated yearly)Valeur20.00144.00200.00
    Date2 décembre 201327 juin 201430 décembre 2016
    ObservationThis value only takes the ABC project into account (the contribution from the GPC project will be added once performance testshavebeen carried out).
  • Share of the envelope allocated to direct seeders in the total FDA envelope allocated to seeders (traditional and direct)Valeur0.000.0016.90
    Date2 décembre 201327 juin 201430 décembre 2016
    Observation
  • Share of DMN revenues from agro-meteorological servicesValeur4.004.0015.00
    Date2 décembre 201327 juin 201430 décembre 2016
    ObservationIt is possible that the end target will need to be revised down if the MOU between ag and meteo takes a more gradual approach totransferring of met services.
  • #of industries having submitted a funding request to the Voluntary Industrial Depollution MechanismValeur0.003.003.00
    Date2 décembre 201327 juin 201430 décembre 2016
    Observation2 projects have already been implemented (in Oujda and Ait-Melloul) and a third one is being implemented in Zaio.
  • # of aquaculture sector jobs created (2013-2016),gender disaggregatedValeur115.00115.00460.00
    Date2 décembre 201327 juin 201430 décembre 2016
    ObservationThe target is likely to be exceeded, as between 700 and 800 jobs are expected to be created before the end of 2015 through 10investments.