DRC Urban Water Supply Project

Résumé*

The objective of the Urban Water Supply Project for the Democratic Republic of Congo is to increase access to water in selected urban areas and increase the efficiency of REGIDESO (State Water Utility Company - DRC). There are two components to the project. The first component of the project will improve and expand water supply services in major urban centers. This component will be carried out through investment and rehabilitation programs specific...

* Le résumé de projet étant tiré du document d'évaluation de projet (PAD), du rapport d'évaluation (SAR) ou du document du programme (PGD), il peut ne pas refléter exactement la teneur du projet en son état actuel.

Voir plus

Objectif de développement

The revised PDO is to increase access to sustainable water services in selected urban areas, and to improve the operational performances and viability of the Project Implementing Entity.

Clé Détails

Projet Détails

  • P091092

  • Closed

  • Rebecca Gilsdorf , Patrick Ndolo

  • Ministry of Finance

  • Congo, République démocratique du

  • 6 mars 2006

  • (à la date de présentation au Conseil)

    18 décembre 2008

  • 13 juin 2008

  • USD 190.00 millions

  • COPIREP,Democratic Republic of Congo, Represented by the Ministry of Finance,REGIDESO

  • Eastern and Southern Africa

  • 2009

  • USD 190.00 millions

  • B

  • 20 juin 2024

  • 30 juin 2021

  • BANK APPROVED

  • Notes

Finances

Plan De Financement (Millions De Dollars)

Pas de données disponibles.
Org. De Financement Engagements
IDA Grant 190.00

Financement total du projet (USD millions)

Type de produit/service BIRD/IDA
Engagement BIRD N/D
Engagement IDA 190.00
Engagement BIRD + IDA 190.00
Instrument de prêt
Élément don N/D
Coût total du projet** 190.00

État récapitulatif du financement de la Banque (USD millions) au 31 mars 2025

Télécharger:
Pas de données disponibles.
Org. De Financement Date D'approbation Date De Cloture Montant En Principal Décaissé Remboursements Intérêts, Charges Et Commissions Financières

Activité financière détaillée au 31 mars 2025

Télécharger:
Pas de données disponibles.
Période Org. De Financement Type De Transaction Montant (USD)

Footnotes

Ratings

EXÉCUTION DU PROJET

Name Review Date
Progress towards achievement of PDO Moderately Satisfactory 2021-02-03
Project Management Moderately Satisfactory 2021-02-03
Financial Management Moderately Satisfactory 2021-02-03
Monitoring and Evaluation Moderately Satisfactory 2021-02-03
Procurement Moderately Satisfactory 2021-02-03
Overall Implementation Progress (IP) Moderately Satisfactory 2021-02-03

FIN D’EXÉCUTION DU PROJET

INDICATEURBILAN DE FIN D’EXÉCUTION ET DE RÉSULTATS: 02-28-2022
RésultatsModerately Unsatisfactory
Risques pour les résultats de développement
Performance de la BanqueModerately Satisfactory
Performance de l'emprunteur
Performance de l’État
Organisme d'exécution

NOTATION DE L’ÉVALUATION INDÉPENDANTE

INDICATEUREXAMEN RFE: RAPPORT D’ÉVALUATION RÉTROSPECTIVE DE PROJET:
Évaluation Des RésultatsModerately Unsatisfactory N/a
Risques Pour Les Résultats De DéveloppementN/a
Performance De La BanqueModerately UnsatisfactoryN/a
Performance De L'emprunteurN/a
Performance De L’étatNot RatedN/a
Organisme D'exécutionN/a
Qualité Des RfeSubstantialN/a
Qualité Du Suivi-évaluationModestN/a

Cadre de résultats

INDICATEURS DES OBJECTIFS DE DÉVELOPPEMENT DU PROJET

INDICATEURNIVEAU DE RÉFÉRENCE EN COURS OBJECTIF
  • Number of people in urban areas provided with access to Improved Water Sources under the projectValeur0.003071430.002600000.00
    Date25 avril 201430 juin 20213 février 2016
    Observation
  • Operating cost coverage ratio in utilities targeted by the projectValeur88.0042.22104.00
    Date18 novembre 200830 juin 202131 mars 2013
    Observation

INDICATEURS DE RÉSULTATS INTERMÉDIAIRES

INDICATEURNIVEAU DE RÉFÉRENCE EN COURS OBJECTIF
  • Secondary and tertiary water networks constructedValeur0.001236.001100.00
    Date18 novembre 200830 juin 202121 décembre 2018
    Observation
  • Citizen engagement satisfactory complaints resolution by REGIDESOValeur26.0083.470.00
    Date29 janvier 201630 juin 2021
    Observation
  • Water production capacity installed under the projectValeur0.0085920.0069000.00
    Date28 novembre 200830 juin 202121 décembre 2018
    Observation
  • Citizen engagement: Surveyed beneficiaries who know at least two of their responsibilities regarding their access to waterValeur0.0098.000.00
    Date29 janvier 201630 juin 2021
    Observation
  • Improved community water points constructed or rehabilitated under the projectValeur0.00455.00450.00
    Date18 novembre 200830 juillet 20203 février 2016
    Observation
  • Number of water utilities that the project is supportingValeur1.001.000.00
    Date18 novembre 200830 juin 2021
    Observation
  • New piped household water connections that are resulting from the project interventionValeur0.0088811.0073500.00
    Date18 novembre 200830 juin 202121 décembre 2018
    Observation
  • Services contract is bid, signed and under implementationValeurNoYes
    Date18 novembre 200830 juin 2021
    Observation
  • Piped household water connections that are benefiting from rehabilitation works undertaken by the projectValeur0.00153490.000.00
    Date18 novembre 200830 juin 2021
    Observation
  • Number of other water service providers that the project is supportingValeur0.000.000.00
    Date18 novembre 200830 juin 2021
    Observation
  • Direct project beneficiariesValeur0.003071430.002600000.00
    Date18 novembre 200830 juin 20213 février 2016
    Observation
  • Preparation of water sanitation strategies and programmValeur0.0012.004.00
    Date18 novembre 200830 juin 20213 février 2016
    Observation
  • Female beneficiariesValeur0.00946815.000.00
    Date18 novembre 200830 avril 2018
    Observation
  • Availability rate of production plantsValeur87.6094.600.00
    Date18 novembre 200830 juin 2021
    Observation
  • Non-revenue waterValeur45.0045.7233.00
    Date18 novembre 200830 juin 202131 mars 2013
    Observation
  • Rate of inactive connections per cityValeur36.0030.950.00
    Date25 avril 201430 juin 2021
    Observation
  • Metering distribution rateValeur33.0070.7490.00
    Date25 avril 201430 juin 20213 février 2016
    Observation
  • Bill collection rate from private connectionsValeur73.0068.7197.00
    Date25 avril 201430 juin 20213 février 2016
    Observation
  • Number of staff/1000 active connections (after severance plan)Valeur17.708.1110.20
    Date25 avril 201430 juin 202131 mars 2013
    Observation
  • Rate of labor costs versus operational costsValeur40.0036.0028.00
    Date25 avril 201430 juin 202131 mars 2013
    Observation
  • Submission of previous years' audit reports to clients by May 15 of following year (yes/no)ValeurNAyesyes
    Date18 novembre 200830 juin 202118 novembre 2013
    Observation
  • Proportion of volumes owed by "Instances Officielles" in total volumes owedValeur21.0034.960.00
    Date25 avril 201413 avril 2020
    Observation
  • Proportion of bills owed by "Instances Officielles" in total billingValeur42.0035.930.00
    Date18 novembre 200830 juin 2021
    Observation