Punjab Municipal Services Improvement Project (PMSIP)

Résumé*

The objective of the project is to improve the viability and effectiveness o f urban services provided by the participating Tehsil Municipal Administration (TMAs), and to make such improvements sustainable and replicable in other. The project consists of the following components: Component 1) Capacity grants will finance needed improvements in TMAs in the fields of urban planning, financial management (including budget management), investment planning...

* Le résumé de projet étant tiré du document d'évaluation de projet (PAD), du rapport d'évaluation (SAR) ou du document du programme (PGD), il peut ne pas refléter exactement la teneur du projet en son état actuel.

Voir plus

Objectif de développement

The objective of the project is to improve the viability and effectiveness of urban services provided by the participating TMAs, and to make such improvements sustainable and replicable in other TMAs through the creation of a performance-based management framework at both TMA and provincial levels.

Clé Détails

Projet Détails

  • P083929

  • Closed

  • Shahnaz Arshad

  • N/A

  • Pakistan

  • 5 août 2003

  • (à la date de présentation au Conseil)

    1 juin 2006

  • 13 juin 2006

  • USD 58.90 millions

  • N/A

  • Asie du Sud

  • 2006

  • USD 50.00 millions

  • A

  • 11 avril 2014

  • 30 novembre 2013

  • BANK APPROVED

  • Notes

Finances

Plan De Financement (Millions De Dollars)

Pas de données disponibles.
Org. De Financement Engagements
International Bank for Reconstruction and Development 50.00
Borrower/Recipient 8.90

Financement total du projet (USD millions)

Type de produit/service BIRD/IDA
Engagement BIRD 50.00
Engagement IDA N/D
Engagement BIRD + IDA 50.00
Instrument de prêt
Élément don N/D
Coût total du projet** 58.90

État récapitulatif du financement de la Banque (USD millions) au 31 mars 2025

Télécharger:
Pas de données disponibles.
Org. De Financement Date D'approbation Date De Cloture Montant En Principal Décaissé Remboursements Intérêts, Charges Et Commissions Financières

Activité financière détaillée au 31 mars 2025

Télécharger:
Pas de données disponibles.
Période Org. De Financement Type De Transaction Montant (USD)

Footnotes

Ratings

EXÉCUTION DU PROJET

Name Review Date
Counterpart Funding Satisfactory 2013-12-11
Progress towards achievement of PDO Satisfactory 2013-12-11
Financial Management Satisfactory 2013-12-11
Monitoring and Evaluation Satisfactory 2013-12-11
Procurement Satisfactory 2013-12-11
Project Management Satisfactory 2013-12-11
Overall Safeguards Rating Satisfactory 2013-12-11
Overall Implementation Progress (IP) Satisfactory 2013-12-11
Overall Safeguards Rating Satisfactory 2013-12-11

FIN D’EXÉCUTION DU PROJET

INDICATEURBILAN DE FIN D’EXÉCUTION ET DE RÉSULTATS: 05-21-2014
RésultatsSubstantial
Risques pour les résultats de développementSubstantial
Performance de la BanqueSubstantial
Performance de l'emprunteurSubstantial
Performance de l’ÉtatSubstantial
Organisme d'exécutionSubstantial

NOTATION DE L’ÉVALUATION INDÉPENDANTE

INDICATEUREXAMEN RFE: 06-02-2015RAPPORT D’ÉVALUATION RÉTROSPECTIVE DE PROJET:
Évaluation Des RésultatsModerately Satisfactory N/a
Risques Pour Les Résultats De DéveloppementSignificantN/a
Performance De La BanqueModerately SatisfactoryN/a
Performance De L'emprunteurModerately SatisfactoryN/a
Performance De L’étatModerately SatisfactoryN/a
Organisme D'exécutionModerately SatisfactoryN/a
Qualité Des RfeUnsatisfactoryN/a
Qualité Du Suivi-évaluationModestN/a

Cadre de résultats

INDICATEURS DES OBJECTIFS DE DÉVELOPPEMENT DU PROJET

INDICATEURNIVEAU DE RÉFÉRENCE EN COURS OBJECTIF
  • Evidence, via reports from independent technical and social audit teams, of improved effectiveness and financial and technical viability of urban services provided by participating TMAsValeurTMAs in need of improved and well structured managFindings of the two ID assessments undertaken at MImproved TMA capacity for provision of effective a
    Date27 novembre 200621 novembre 201330 novembre 2013
    Observation
  • Evidence of rising levels of satisfaction among key stakeholder groups with respect to services targeted under the project and improvement in selected service delivery indicators.ValeurRefer intermediate outcome indicators.Results from the independent third-party survey ofImprovements in TMAs’ key service delivery indicat
    Date27 novembre 200621 novembre 201330 novembre 2013
    Observation
  • Evidence of GoPunjab's improved capacity to monitor TMA performance.ValeurGoPunjab currently has no ability to systematicallIntegrated web-based Performance Management SystemData Networking and Performance Monitoring System
    Date27 novembre 200621 novembre 201330 novembre 2013
    Observation
  • Evidence of GoPunjab's improved capacity to manage cultural heritage assetsValeurOverlapping institutional mandates and lack of cooThe Walled City of Lahore Authority (WCLA) has beeGoPunjab will have a clear and effective instituti
    Date27 novembre 200621 novembre 201330 novembre 2013
    Observation

INDICATEURS DE RÉSULTATS INTERMÉDIAIRES

INDICATEURNIVEAU DE RÉFÉRENCE EN COURS OBJECTIF
  • % of households connected with water supply systemValeur40% (average of 11 TMAs with PMSIP water supply su53% (average of 11 TMAs with PMSIP water supply59%
    Date27 novembre 200631 octobre 201330 novembre 2013
    ObservationBaseline and target values updated to 11 TMAs.
  • % of solid waste disposed per day at landfill siteValeur0 (average of 6 TMAs with landfill sites developed74% (average of 6 TMAs with landfill sites develop70%
    Date27 novembre 200631 octobre 201330 novembre 2013
    ObservationNo landfill site developed under the project was operating in partner TMAs.
  • % of street lights workingValeur70% (average of 105 TMAs)73% (Average of 105 TMAs)75%
    Date27 novembre 200631 octobre 201330 novembre 2013
    Observation
  • Number of TMAs Having 90% complaint resolution efficiencyValeur20.0081.0075.00
    Date2 août 201031 octobre 201330 novembre 2013
    ObservationThis indicator has been added following project restructuringThis indicator has been added following project restructuring
  • Number of TMAs generating monthly Performance Management System (PMS) reports (atleast 9 reports in a year)Valeur12.0081.0040.00
    Date2 août 201031 octobre 201330 novembre 2013
    ObservationThis indicator has been added following project restructuringThis indicator has been added following project restructuring
  • Number of TMAs staff trained in IT, planning, O&M etc.Valeur1000.003137.002300.00
    Date2 août 201031 octobre 201330 novembre 2013
    ObservationThis indicator has been added following project restructuringThis indicator has been added following project restructuring
  • Number of TMAs having updated GIS based service mapsValeur30.00104.00100.00
    Date2 août 201031 octobre 201330 novembre 2013
    ObservationThis indicator has been added following project restructuringThis indicator has been added following project restructuring
  • Number of TMAs having updated plansValeur20.00104.0075.00
    Date2 août 201031 octobre 201330 novembre 2013
    ObservationThis indicator has been added following project restructuringThis indicator has been added following project restructuring
  • Number of TMAs using FMS generated reports for the annual local fund audit.Valeur0.00102.0010.00
    Date2 août 201031 octobre 201330 novembre 2013
    ObservationThis indicator has been added following project restructuringThis indicator has been added following project restructuring.CFMS reports are being generated by 102 TMAs. Office of DG Audit ispreparing for system audit, once Account Rules, Budget Rules, and Rules of Business under PLGA 2013 are operationalized.