Skip to Main Navigation

Ho Chi Minh City Environmental Sanitation (Nhieu Loc-Thi Nghe Basin) Project

Résumé*

The Ho Chi Minh City Environmental Sanitation Project will lead to sustainable improvements in public health, and the well-being of the city's population, through improved reductions in wastewater pollution, and in flood occurrences, as a result of institutional efficiency in the management of drainage, and wastewater services. The two components are: 1) Construction of the Nghie Loc Thi Nghe wastewater interceptor, to divert dry weather wastewater...

* Le résumé de projet étant tiré du document d'évaluation de projet (PAD), du rapport d'évaluation (SAR) ou du document du programme (PGD), il peut ne pas refléter exactement la teneur du projet en son état actuel.

Voir plus

Objectif de développement

Reduce the incidence of flooding and increase the collection of wastewater in the Nhieu Loc Thi Nghe (NLTN) Basin in HCMC, in an environmentally and financially sustainable manner.

Clé Détails

Projet Détails

  • P052037

  • Closed

  • Dean Cira

  • N/A

  • Viet Nam

  • 4 janvier 2000

  • (à la date de présentation au Conseil)

    20 mars 2001

  • 3 février 2002

  • USD 166.34 millions

  • A

  • 15 janvier 2013

  • 30 juin 2012

  • BANK APPROVED

  • Notes

Finances

Plan De Financement (Millions De Dollars)

Pas de données disponibles.
Org. De Financement Engagements
IDA Credit 166.34
Borrower/Recipient 33.62

Financement total du projet (USD millions)

Type de produit/service BIRD/IDA
Engagement BIRD N/D
Engagement IDA 166.34
Engagement BIRD + IDA 166.34
Instrument de prêt
Élément don N/D
Coût total du projet** 199.96

État récapitulatif du financement de la Banque (USD millions) au 31 mars 2025

Télécharger:
Pas de données disponibles.
Org. De Financement Date D'approbation Date De Cloture Montant En Principal Décaissé Remboursements Intérêts, Charges Et Commissions Financières

Activité financière détaillée au 31 mars 2025

Télécharger:
Pas de données disponibles.
Période Org. De Financement Type De Transaction Montant (USD)

Footnotes

Ratings

EXÉCUTION DU PROJET

Name Review Date
Counterpart Funding Satisfactory 2012-07-08
Project Management Moderately Satisfactory 2012-07-08
Procurement Moderately Satisfactory 2012-07-08
Overall Implementation Progress (IP) Moderately Satisfactory 2012-07-08
Progress towards achievement of PDO Moderately Satisfactory 2012-07-08
Financial Management Moderately Satisfactory 2012-07-08
Monitoring and Evaluation Moderately Satisfactory 2012-07-08

FIN D’EXÉCUTION DU PROJET

INDICATEURBILAN DE FIN D’EXÉCUTION ET DE RÉSULTATS: 12-30-2012
RésultatsModerately Satisfactory
Risques pour les résultats de développementModest
Performance de la BanqueModerately Satisfactory
Performance de l'emprunteurModerately Satisfactory
Performance de l’ÉtatModerately Unsatisfactory
Organisme d'exécutionModerately Satisfactory

NOTATION DE L’ÉVALUATION INDÉPENDANTE

INDICATEUREXAMEN RFE: 08-19-2013RAPPORT D’ÉVALUATION RÉTROSPECTIVE DE PROJET:
Évaluation Des RésultatsModerately Satisfactory N/a
Risques Pour Les Résultats De DéveloppementSignificantN/a
Performance De La BanqueModerately SatisfactoryN/a
Performance De L'emprunteurModerately SatisfactoryN/a
Performance De L’étatModerately UnsatisfactoryN/a
Organisme D'exécutionModerately SatisfactoryN/a
Qualité Des RfeUnsatisfactoryN/a
Qualité Du Suivi-évaluationModestN/a

Cadre de résultats

INDICATEURS DES OBJECTIFS DE DÉVELOPPEMENT DU PROJET

INDICATEURNIVEAU DE RÉFÉRENCE EN COURS OBJECTIF
  • Reduction in the number of households affected by two year return period stormValeur0.0096000.0096000.00
    Date1 janvier 200719 juin 20121 juin 2012
    ObservationChanged during restructuringData from the Steering Committee for Flood Control indicates reduced flooding in the NLTN catchment area since 2007, despiteincreased rainfall. Over 1.2 million people benefit from the reduced flooding, and thus the target of 96000 households has beenexceeded.This target has been reached or exceeded based on the overall population of the catchment area.
  • Increase in the number of households whose wastewater is collected and disposed of safelyValeur0.00200000.00240000.00
    Date1 janvier 200719 juin 201230 juin 2012
    ObservationChanged during restructuringEstimate is based on actual works progress to date. Actual numbers will be assessed only after the project closing when thesurveyof level three and four sewers is completed.This is expected to have been reached, but the actual survey will only be completed after project closes. and the survey iscompleted.
  • Improvement in the water quality of the NLTN Canal measured by the average level of dissolved oxygen (DO)Valeur0.052.004.00
    Date4 janvier 201031 mai 201230 juin 2012
    ObservationTaken at low tideLow tide average in the NLTN canal was 2.0, already much improved from the baseline. Though this is less than the target value,itshows strong improvement over the baseline. Once operational, this should improve further.Target is a value of at least 4 measured as Mg/l. Water quality is already much improved from the baseline samples. The resultsindicate the dredging is serving to improve water quality. Once the interceptor is commissioned the water quality is expected toimprove further. The ICR will include further water quality monitoring results.
  • Implementation of the agreed tariif schedule by the People's Committee of Ho Chi Minh CityValeur250.00450.00450.00
    Date1 janvier 200726 octobre 20111 juin 2012
    ObservationValue is Vietnam Dong (VND) per cubic meterChanged during restructuringBased on the approved tariff decreesThe actual tariff is now higher than the target of VND450 as the water tariff has continued to increase. The road map to 2015expects to increase the waste water tariff the 15% of the water tariff by 2015.

INDICATEURS DE RÉSULTATS INTERMÉDIAIRES

INDICATEURNIVEAU DE RÉFÉRENCE EN COURS OBJECTIF
  • KM of wastewater interceptor constructedValeur5.009.008.40
    Date11 janvier 200720 juin 20121 juin 2012
    ObservationThe interceptor has been 100% completed.100% complete.
  • KM of combined primary and secondary sewers replaced and constructed.Valeur2.0052.0059.50
    Date11 janvier 200720 juin 20121 juin 2012
    ObservationAdded as part of 2009 restructuring.Final amount is less than earlier projection due to design change. But Target is considered met.Target met as of final mission.
  • KM of sheet piles installed for canal embankmentsValeur1.0016.3018.00
    Date11 janvier 200720 juin 20121 juin 2012
    ObservationAdded at restructuring in 2009.The canal improve was complete at time of last mission. Design changes resulted in fewer KM of piles required.Target met
  • Cubic Meters of sludge and excavated material dredeged.Valeur0.00946069.001029000.00
    Date11 janvier 200713 juin 20121 juin 2012
    ObservationAdded as part of restructuring in 2009Independent hydrographic survey confirmed this amount.Target met as of last mission. Some minor dredging is still required at certain bridges.